By Jeff Beavers, on May 6th, 2010
Whew, the tank is up!!!. Just need to finish putting all the bolts. Ran out of bolts and have some more ordered. Here is a pic of the inside.
I also took some pictures of the back vineyards, while I had the boom lift working on the tank. These are pretty neat seeing . . . → Read More: 65k Gallon Water tank – Tier 3 done
By Jeff Beavers, on April 27th, 2010
Whew.. we just finished putting up the second tier of the water tank. This thing is really starting to look BIG now. Basically we have gone around and just put enough bolts to hold it up at this point. Once we have it all up, we will come back and put in all of . . . → Read More: 65k Water Tank – Tier 2
By Jeff Beavers, on April 15th, 2010
We have started again on putting up the 65k Gallon Water tank for irrigation of the vines. Here, we it all set out on the ground where the pieces should go.
We didn’t know how to get to the bottom of the bolt heads to hold them in place, so we decided to . . . → Read More: 65k Water Tank Progress April 2010
By Jeff Beavers, on July 29th, 2009
The 65k Gallon water tank is yet again getting some attention.
This week, we installed the retaining ring for the base, filled it with gravel, and leveled the gravel. There is about 12 cubic yards of road gravel there.
The ring itself is 24 feet in diameter. The base is packed around 7 inches . . . → Read More: 65k Gallon Water Tank – Base Ring assembled
By Jeff Beavers, on April 14th, 2009
Since the vineyard was still pretty damp, I chose to work on the 65k water tank base (where it will be placed). To accomplish this, I needed a few tools. The first, is a laser level.
Next, is a laser sensor for excavation work.Â
This sensor has a 6″ side . . . → Read More: 65k Water Tank – Base Leveled Apr 2009
|
|